This big concrete saw is used to cut the existing sidewalk along the buildings on Mackay Main Street.
The exisiting sidewalks are being removed along Mackay Main Street.
Big Lost River Irrigation Office (on left) at Salmon and Main Street.
The existing sidewalk on Pine and Main beside Ivies has been removed and hauled off.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment